{"id":150,"date":"2022-02-12T01:33:03","date_gmt":"2022-02-12T01:33:03","guid":{"rendered":"https:\/\/ndv-arc.co.za\/?p=150"},"modified":"2022-02-21T11:36:16","modified_gmt":"2022-02-21T11:36:16","slug":"house-mahon-municipal-approval","status":"publish","type":"post","link":"https:\/\/ndv-arc.co.za\/?p=150","title":{"rendered":"House Mahon | Municipal Approval"},"content":{"rendered":"\n<p><strong><em>Radiokop, Roodepoort, South Africa \u2014 2022<\/em><\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"998\" src=\"https:\/\/ndv-arc.co.za\/wp-content\/uploads\/2022\/02\/Drawing-Upload-1-1024x998.jpg\" alt=\"\" class=\"wp-image-152\" srcset=\"https:\/\/ndv-arc.co.za\/wp-content\/uploads\/2022\/02\/Drawing-Upload-1-1024x998.jpg 1024w, https:\/\/ndv-arc.co.za\/wp-content\/uploads\/2022\/02\/Drawing-Upload-1-300x292.jpg 300w, https:\/\/ndv-arc.co.za\/wp-content\/uploads\/2022\/02\/Drawing-Upload-1-768x748.jpg 768w, https:\/\/ndv-arc.co.za\/wp-content\/uploads\/2022\/02\/Drawing-Upload-1-1536x1496.jpg 1536w, https:\/\/ndv-arc.co.za\/wp-content\/uploads\/2022\/02\/Drawing-Upload-1-2048x1995.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>As of early 2022 at the end of January, a Mrs. P. R. Mahon requested some assistance in order to obtain Municipal Approval for the additions and\/or alterations to their existing residence out in Radiokop. This entailed a week of drawing and then we were ready for municipal submission. This project is also one of the first for NDV-ARC | Architecture | to be processed through the newly available online submission system at the City of Johannesburg. Fingers crossed all goes well.<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Radiokop, Roodepoort, South Africa \u2014 2022<\/p>\n","protected":false},"author":1,"featured_media":99,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9,6,11,10,12,8],"tags":[],"class_list":["post-150","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-additions-alterations","category-architecture","category-as-built-drawings","category-council-drawings","category-municipal-approval","category-residential"],"_links":{"self":[{"href":"https:\/\/ndv-arc.co.za\/index.php?rest_route=\/wp\/v2\/posts\/150","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ndv-arc.co.za\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ndv-arc.co.za\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ndv-arc.co.za\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ndv-arc.co.za\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=150"}],"version-history":[{"count":4,"href":"https:\/\/ndv-arc.co.za\/index.php?rest_route=\/wp\/v2\/posts\/150\/revisions"}],"predecessor-version":[{"id":167,"href":"https:\/\/ndv-arc.co.za\/index.php?rest_route=\/wp\/v2\/posts\/150\/revisions\/167"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ndv-arc.co.za\/index.php?rest_route=\/wp\/v2\/media\/99"}],"wp:attachment":[{"href":"https:\/\/ndv-arc.co.za\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=150"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ndv-arc.co.za\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=150"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ndv-arc.co.za\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=150"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}